国产麻豆精品av在线观看,特级AAAAAAAAA毛片免费视频,无码H版动漫在线观看,国产伦精品免编号公布

Hotline:13771485234
 
CHINESE ENGLISH  
 
Advanced and complete …
Concrete delivery cyli…
Hydraulic cylinders
S Valve
Wear sleeve
Transition sets
 
 
NEWS
Concrete pump pumping main points
Publisher:admin  Time:2014/4/7 8:39:17  Click:2263

Concrete pump pumping main points

Source: Author: Date: 2013-08-20 Views: 192 Comments: 0 Favorite Print

Abstract: Concrete pump

  (1) concrete pumpability. Concrete pump pumping requirements can be satisfied, when necessary, to determine the mix of pumping concrete pumping through trial.

    ① maximum ratio of coarse aggregate size and caliber of delivery should be: When pumping height 50m or less, not more than one for gravel: 3, for not more than a pebble: 2.5; pumping height at 50 ~ 100m time , should be 1: 3 to 1: 4 range; pumping height of 100m above, should be 1: 4 to 1: 5 between. Flakiness particle content of not more than 10%.

    ② different pumping height, the pump may slump concrete (Table) selection.

     Pumping height (m) 30 or less than 30 ~ 60 60 ~ 100 100

     Slump (m) 100 ~ 140 140 ~ 160 160 ~ 180 180 ~ 200

    ③ suitable for pumping concrete water-cement ratio (0.4 to 0.6): 1.

    ④ sand pumping concrete should rate was 38% to 45%. Fine aggregate should be adopted in the sand, the amount of sand sieve through 0.315m not less than 15%.

    ⑤ Pumpcrete minimum cement content of 300kg / m3.

(2) concrete pump should start pumping after an appropriate amount of water to wet the concrete pump hopper, concrete cylinder and the feed pipe in direct contact with the concrete site. Pumping water and then using one of these methods lubricate these parts: pumping grout; pumping 1: 2 cement mortar; pumping in addition to other components outside the coarse aggregate ratio of cement mortar.

    Lubricated with grout or cement mortar should be decentralized fabric, not concentrated in the same place pouring.

(3) at the start of pumping, concrete pumps should be in a slow, constant speed running state, and then gradually accelerate. And should observe the work pressure of concrete pumps and systems, and the systems to be able to work behind the normal speed pumping.

(4) work as continuous pumping concrete, concrete cylinder piston stroke should be kept to a maximum run to maximize the performance of concrete pumps and concrete cylinders can wear the uniform in the longitudinal direction.

(5) If there is high pressure concrete pump and unstable temperature rise. When vibration and pumping duct obvious difficulties phenomenon, can not be forcibly pumping, should be excluded immediately identify the cause. Can be obtained with a mallet percussion duct elbow. Conical tubes and other parts, and slow or reverse pumping pumps to prevent clogging.

(6) When a blockage occurs, it should take the following measures:

    ① repeated anti-pump and pump are running, gradually returned to suck out the concrete hopper, by mixing and re-pumped.

    ② with a mallet percussion and other methods to identify the blockage site of repeated anti-pump and pump run until after being hit loose concrete to eliminate clogging.

    ③ When the above two methods are ineffective, should be disassembled after the concrete relief blockage site, re-pumping to be discharged after the blockage.

(7) should be used to pump concrete ready-mix concrete, can also be set up at the scene stirred Station Supply pumping concrete, but not pumping hand mixing concrete. Concrete supply should be strictly controlled, and pay attention to changes in the slump, do not meet the requirements of the concrete pumping is not allowed into the pump, in order to ensure the effective work of the concrete pump.

(8) should be set on a concrete pump hopper screen, and let someone feed monitoring to avoid excessive aggregate diameter or foreign objects entering and causing blockage.

(9) When pumping, the stock of the concrete inside the hopper can not be lower than the position of the agitator shaft to prevent air from entering the pump tube caused by pipeline vibration.

(10) when the concrete pumping process requires terminal interrupt time should not exceed 1h. And should be every 5 ~ 10min anti pumps and pump operation are to prevent the pipeline due to bleeding or concrete slump loss is too large and blocked tubes.

(11) After pumping is completed, must be carefully cleaned hopper and pipeline systems. Residual concrete concrete cylinder if removal is not clean, will solidify on the cylinder wall when the piston is running again, the piston sealing surface will have a direct impact on the cylinder wall to withstand the concrete has cured them, causing the piston to push the local spalling. This damage is different from the normal wear of the piston seals, sealing surface can not be self-compensated under pressure, resulting in leakage of plasma or suck air, causing pumping weakness, blockage.

(12) when the concrete can be poor or the concrete pump bleeding, segregation and difficult to pump, should immediately mix, research concrete pumps, piping and pumping process, etc., and take appropriate measures to resolve.

Pre:Concrete pump master cylinder unable commutation Causes
Next:Concrete pumping Notes
    
 
四川妇女搡BBBB搡BBBB搡′一 | 亚洲AV男人的天堂在线观看 | 精品人妻少妇嫩草AⅤ无码 欧美 中文字幕成人 aⅴ | 影音先锋中文字幕在线观看 | 国产又粗又长在线观看 | 日韩 国产 欧美 | 人妻一区二区三区在线 | 精品视频国产九色 | 亚洲内地激情无遮挡 | 嗯灬啊灬把腿张开灬A片视频网站 | 久久久天堂国产精品女人 | 日韩精品字幕无码专区 | 日本乱偷中文字幕 | 又影音先锋AV在线资源 | 日韩乱码人妻无码超清蜜桃丨 | 国产日韩欧美一区二区 | 成人亚洲精品一区二区三区 | 特大黑人娇小亚洲女 | 在线看中文字幕国产 | 国产午夜精品一区二区三区视频 | 国产一级一级a毛免费观 | 狠狠狠狠鲁鲁鲁91 | 精品国产乱码久久久久夜深人妻 | 国产精品高清无码在线观看 | 精品久久久久久中文字幕 | 国产精品免费免费视频 | 老熟女露脸吞精91 | 啊快点黄色视频在线观看免费 | 亚洲第一日韩人妻变态AV | 水蜜桃视频在线播放 | 亚洲阿v天堂2017在线看先锋最新视频 | 91精品人人妻人人澡人人爽人人精东影业 | 日本无码一级婬片A片午夜dj | 亚洲制服丝袜一区二区 | 黄色网址在线免费观看 | www.71.com色婬免费 | 欧美成人乱码一区二区三区 | 国产做爰又粗又大的视频 | 特级丰满少妇一级AAA | 大吊香中出伊人福利 | 亚洲天堂亚洲精品 |