Concrete pump pumping main points
Publisher:admin  Time:2014/4/7 8:39:17  Click:2263

Concrete pump pumping main points

Source: Author: Date: 2013-08-20 Views: 192 Comments: 0 Favorite Print

Abstract: Concrete pump

  (1) concrete pumpability. Concrete pump pumping requirements can be satisfied, when necessary, to determine the mix of pumping concrete pumping through trial.

    ① maximum ratio of coarse aggregate size and caliber of delivery should be: When pumping height 50m or less, not more than one for gravel: 3, for not more than a pebble: 2.5; pumping height at 50 ~ 100m time , should be 1: 3 to 1: 4 range; pumping height of 100m above, should be 1: 4 to 1: 5 between. Flakiness particle content of not more than 10%.

    ② different pumping height, the pump may slump concrete (Table) selection.

     Pumping height (m) 30 or less than 30 ~ 60 60 ~ 100 100

     Slump (m) 100 ~ 140 140 ~ 160 160 ~ 180 180 ~ 200

    ③ suitable for pumping concrete water-cement ratio (0.4 to 0.6): 1.

    ④ sand pumping concrete should rate was 38% to 45%. Fine aggregate should be adopted in the sand, the amount of sand sieve through 0.315m not less than 15%.

    ⑤ Pumpcrete minimum cement content of 300kg / m3.

(2) concrete pump should start pumping after an appropriate amount of water to wet the concrete pump hopper, concrete cylinder and the feed pipe in direct contact with the concrete site. Pumping water and then using one of these methods lubricate these parts: pumping grout; pumping 1: 2 cement mortar; pumping in addition to other components outside the coarse aggregate ratio of cement mortar.

    Lubricated with grout or cement mortar should be decentralized fabric, not concentrated in the same place pouring.

(3) at the start of pumping, concrete pumps should be in a slow, constant speed running state, and then gradually accelerate. And should observe the work pressure of concrete pumps and systems, and the systems to be able to work behind the normal speed pumping.

(4) work as continuous pumping concrete, concrete cylinder piston stroke should be kept to a maximum run to maximize the performance of concrete pumps and concrete cylinders can wear the uniform in the longitudinal direction.

(5) If there is high pressure concrete pump and unstable temperature rise. When vibration and pumping duct obvious difficulties phenomenon, can not be forcibly pumping, should be excluded immediately identify the cause. Can be obtained with a mallet percussion duct elbow. Conical tubes and other parts, and slow or reverse pumping pumps to prevent clogging.

(6) When a blockage occurs, it should take the following measures:

    ① repeated anti-pump and pump are running, gradually returned to suck out the concrete hopper, by mixing and re-pumped.

    ② with a mallet percussion and other methods to identify the blockage site of repeated anti-pump and pump run until after being hit loose concrete to eliminate clogging.

    ③ When the above two methods are ineffective, should be disassembled after the concrete relief blockage site, re-pumping to be discharged after the blockage.

(7) should be used to pump concrete ready-mix concrete, can also be set up at the scene stirred Station Supply pumping concrete, but not pumping hand mixing concrete. Concrete supply should be strictly controlled, and pay attention to changes in the slump, do not meet the requirements of the concrete pumping is not allowed into the pump, in order to ensure the effective work of the concrete pump.

(8) should be set on a concrete pump hopper screen, and let someone feed monitoring to avoid excessive aggregate diameter or foreign objects entering and causing blockage.

(9) When pumping, the stock of the concrete inside the hopper can not be lower than the position of the agitator shaft to prevent air from entering the pump tube caused by pipeline vibration.

(10) when the concrete pumping process requires terminal interrupt time should not exceed 1h. And should be every 5 ~ 10min anti pumps and pump operation are to prevent the pipeline due to bleeding or concrete slump loss is too large and blocked tubes.

(11) After pumping is completed, must be carefully cleaned hopper and pipeline systems. Residual concrete concrete cylinder if removal is not clean, will solidify on the cylinder wall when the piston is running again, the piston sealing surface will have a direct impact on the cylinder wall to withstand the concrete has cured them, causing the piston to push the local spalling. This damage is different from the normal wear of the piston seals, sealing surface can not be self-compensated under pressure, resulting in leakage of plasma or suck air, causing pumping weakness, blockage.

(12) when the concrete can be poor or the concrete pump bleeding, segregation and difficult to pump, should immediately mix, research concrete pumps, piping and pumping process, etc., and take appropriate measures to resolve.

Pre:Concrete pump master cylinder unable commutation Causes
Next:Concrete pumping Notes
    
 
欧性猛交XXXX乱大交 | 成人免费毛片 糖心视频 | 国产精品久久久久高潮一牛 | 久久精品伊人无码二区69 | 亚洲又大又黄又白又嫩视频 | 午夜福利欧美1000 | 少妇荡乳欲伦交换A片欧美 中文字幕在线免费观看视频 | 亚洲无码视频在线观看 | 免费A片全黄少妇内谢动漫 美女視頻播放八區九區視頻 | 黄色三级片请观看 | 无码人妻aⅴ一区二区三区69堂 | 国产精品9966 | 美国性生吞禁忌8 | 一本一道人妻少妇AV免费久久 | 色噜噜综合熟女人妻一区 | 国内精品人妻无码久久久影院蜜桃 | 红桃中文字幕综合区 | 视频 日韩 中文字幕 制服 | 狠狠躁18三区二区一区 | 亚洲国产精品久久久久日本竹山梨 | 久久久久无码精品国产 | 先锋影音在线播放 | 免费看A片AAA片三黄白浆 | 国产裸体美女无遮挡永久免费 | Japan少妇性视频 | 黄色精品国产成人小说网站免费 | 成年人黄色片A片 | 波多野结衣无码高清 | 无码精品人妻一区二区三区综合部 | 殴美大黑BBBBBBBBB| 亚洲精品在线视频 | 色综合高清无码在线 | 亚洲AV秘 成人久久无码海归 | 欧美丰满一区二区免费视频 | 久久久91人妻一区二区 | 国产女人高潮在线观看69VL | 91成人 在线观看喷潮游戏 | 91久久久久毛片一级A片直播 | av导航福利地址发布 | 国产一级a毛一级看免费视频 | 国产全肉乱妇杂乱视频在线看 |